Matching Items (73)
Filtering by

Clear all filters

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2009 to 2015
Description

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for

The Neighborhood Reinvestment Program has been in existence since the 1997 Pima County bond election established General Obligation Bond funding for construction of small scale capital improvement projects to be selected through a neighborhood consensus process. Specific projects are recommended by the citizen committees to the Board of Supervisors for final approval.

Created2010 to 2013
Description

The Commission was created in 2003. Each report briefly outlines the activities of the past year and the projects for the coming year.

Created2008-11
Description
The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and

The Pima County Department of Transportation proposes to widen approximately 1 mile of La Cholla Boulevard from a two-lane roadway into a six-lane arterial street between Ruthrauff Road and River Road. The project includes improvements to the intersections of La Cholla Boulevard and Ruthrauff Road and La Cholla Boulevard and Curtis Road, plus replacement of the bridge over the Rillito River.
Created2005 to 2008
Description

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property

The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.

42275-Thumbnail Image.png
Created2013-04
Description

From 2010 to early 2013, under the leadership of the Pima County Health Department, organizations and community members engaged in a comprehensive community health assessment and improvement planning process. The goal of this intensive, community-driven process was to examine the current health needs of Pima County residents and determine how

From 2010 to early 2013, under the leadership of the Pima County Health Department, organizations and community members engaged in a comprehensive community health assessment and improvement planning process. The goal of this intensive, community-driven process was to examine the current health needs of Pima County residents and determine how to best address them.

42276-Thumbnail Image.png
ContributorsPima County (Ariz.). Health Department (Contributor)
Created2011
Description

This report is a summary of the Pima County Community Health Assessment that was conducted in 2011. As facilitator, the Pima County Health Department examined existing data describing the community, surveyed residents and stakeholders about their perceptions of the health status of Pima County, and presented these findings to the

This report is a summary of the Pima County Community Health Assessment that was conducted in 2011. As facilitator, the Pima County Health Department examined existing data describing the community, surveyed residents and stakeholders about their perceptions of the health status of Pima County, and presented these findings to the Community Health Assessment Taskforce. The community members who comprised the taskforce evaluated the information and identified five priorities that would make a significant positive impact on the health status of Pima County residents.

Created2009 to 2011
Description

Assessing and addressing the public’s changing needs is a challenging task. The Health Department uses a variety of measures to evaluate program accomplishments while holding itself accountable to the taxpayers. The economic challenges faced by the County and its residents require the Department to rely more on quality improvement approaches

Assessing and addressing the public’s changing needs is a challenging task. The Health Department uses a variety of measures to evaluate program accomplishments while holding itself accountable to the taxpayers. The economic challenges faced by the County and its residents require the Department to rely more on quality improvement approaches to maximize the limited resources. Here are some highlights of the Health Department’s achievements in efficiently providing needed public health services.