Filtering by
- All Subjects: Floodplain management
- All Subjects: Water use
- Creators: Battelle Memorial Institute. Technology Partnership Practice
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in nonpoint source pollutant loadings and improvement in water quality resulting from program implementation.
The purpose of this report is to present the data gathered to date in the Santa Cruz AMA in support of the management goal and groundwater modeling effort. This report presents groundwater and surface water monitoring data, USGS stream gaging data, effluent data, gravity studies, historical water use and water quality data for three distinctive stream reaches of the Santa Cruz River.
The purpose of this project was to compile information on groundwater withdrawals and surface water diversions near perennial streams, intermittent streams, and shallow groundwater areas previously identified by PAG for the SDCP. The information could be used to prioritize future investigations of potential impacts of these withdrawals and diversions on riparian and aquatic habitats for the SDCP.
Pima Association of Governments updated a portion of the Water Usage Along Selected Streams in Pima County, Arizona, which PAG created in 2000. The updated report and datasets show current potential water usage in these critical areas. Deliverables include the shapefiles, spreadsheets and maps that accompany this memorandum. The purpose of this report is to provide updated information about the location and pumping history of wells located in Pima County near shallow groundwater areas, generally located near drainages.
The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.
The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.
The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.
The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.
This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.