Matching Items (20)
Filtering by

Clear all filters

Created2014 to 2017
Description

The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.

Created2005 to 2016
Description

Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-09-03
Description

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the Picture Rocks study area and recommend a program of short-range (0-5 years), mid-range (6-10 years), and long-range (11-20 years) improvements.

42332-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-06
Description

Transportation excise tax money is statutorily restricted to street and highway purposes or transportation projects. Gila County demonstrated that it spent excise tax monies during calendar years 2009 through 2013 to address traffic safety and congestion issues and deteriorating road conditions. Also, in January 2014, the County completed the Gila

Transportation excise tax money is statutorily restricted to street and highway purposes or transportation projects. Gila County demonstrated that it spent excise tax monies during calendar years 2009 through 2013 to address traffic safety and congestion issues and deteriorating road conditions. Also, in January 2014, the County completed the Gila County Transportation Study, which identified the most critical future transportation infrastructure needs and recommended projects to address those needs. We also determined that the County spent its excise tax monies solely for street and highway purposes or transportation projects as required by Arizona Revised Statutes §28-6392(B), and implemented all but one of our prior audit recommendations.

Created2010-06-10
Description

The purpose of this study is to provide flood and erosion hazard information for Soldier Canyon Wash for use by the District in floodplain use permitting and and floodplain management.

42186-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-12-15
Description

ADOC retained CGL to conduct a comprehensive review of the existing protocols, the application of these protocols in the case of Joseph R. Wood III, and an assessment as to whether the existing protocols are consistent with national best practices.

42289-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2008-10-07
Description

This Technical Data Notebook has been prepared in support of a Letter of Map Revision application for a portion of the Friendly Village Wash. It includes detailed hydrologic and hydraulic analyses performed to determine proposed regulatory discharge rates at key locations along the Wash, and to determine floodplain limits.

42298-Thumbnail Image.png
Created2010-06-30
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Camino De Oeste Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Camino De Oeste Wash

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Camino De Oeste Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Camino De Oeste Wash using better topographic, hydrologic, and hydraulic data.

42299-Thumbnail Image.png
Created2010-05-06
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the West Speedway Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the West Speedway Wash using better

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the West Speedway Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the West Speedway Wash using better topographic, hydrologic, and hydraulic data.