Matching Items (14)
Filtering by

Clear all filters

Created2013-08
Description

Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks

Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks that are desired to provide safe and convenient pedestrian and bicycle access and connectivity to select Santa Cruz Valley Unified School District No. 35 facilities as well as use for the general public for transportation and recreational purposes.

Created2012-05
Description

The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.

Created2003-04
Description

A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.

Created2012-11
Description

The Pinal Creek Trail corridor study is being conducted in conjunction with the Cobre Valley Comprehensive Transportation Study, to provide alternative modes of transportation to key educational and recreational areas in the Globe area. The purpose of the study is to review previous trail studies and recreation trail plans that

The Pinal Creek Trail corridor study is being conducted in conjunction with the Cobre Valley Comprehensive Transportation Study, to provide alternative modes of transportation to key educational and recreational areas in the Globe area. The purpose of the study is to review previous trail studies and recreation trail plans that will address the most critical current and future non-motorized modes of transportation within the study area. The concept of turning Pinal Creek, which runs through the City, into a functioning urban greenbelt, has long been the dream of several citizens of the community.

Created2001-12
Description

Pima County, in partnership with the National Park Service, has been an active participant in the development of a 70 mile segment of the trail. With the preparation of this Master Plan, Pima County has embarked on an active program to acquire the necessary rights-of-way and easements and to construct

Pima County, in partnership with the National Park Service, has been an active participant in the development of a 70 mile segment of the trail. With the preparation of this Master Plan, Pima County has embarked on an active program to acquire the necessary rights-of-way and easements and to construct the Pima County segment of the national historic trail.

41896-Thumbnail Image.png
Created2012-01
Description

A summary of a survey taken in July 2011 of users of the Flagstaff Urban Trails System. The City of Flagstaff will use the results to collect demographic data on trail users, determine patterns of use, and identify specific locations for new trails and trail improvements.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.