Matching Items (16)
Filtering by

Clear all filters

42418-Thumbnail Image.png
Created2014-03
Description

Provides recommendations that improve and enhance the inter-connectivity of trails and transit mobility in the City of Show Low and transit efficiency in the White Mountains, including the communities of Pinetop-Lakeside, Snowflake, Taylor, Holbrook and the White Mountain Apache Tribe. Upon its completion the study was further intended to update

Provides recommendations that improve and enhance the inter-connectivity of trails and transit mobility in the City of Show Low and transit efficiency in the White Mountains, including the communities of Pinetop-Lakeside, Snowflake, Taylor, Holbrook and the White Mountain Apache Tribe. Upon its completion the study was further intended to update the City’s Five Year Transit Plan and the Trails Element of the Show Low General Plan.

Created2003-04
Description

A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.

Created2012-05
Description

The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.

42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
Created2013-08
Description

Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks

Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks that are desired to provide safe and convenient pedestrian and bicycle access and connectivity to select Santa Cruz Valley Unified School District No. 35 facilities as well as use for the general public for transportation and recreational purposes.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.