Filtering by
- All Subjects: Hydrology
- All Subjects: Trails
- All Subjects: United States--Commerce--Mexico
- Creators: Battelle Memorial Institute. Technology Partnership Practice
Provides recommendations that improve and enhance the inter-connectivity of trails and transit mobility in the City of Show Low and transit efficiency in the White Mountains, including the communities of Pinetop-Lakeside, Snowflake, Taylor, Holbrook and the White Mountain Apache Tribe. Upon its completion the study was further intended to update the City’s Five Year Transit Plan and the Trails Element of the Show Low General Plan.
A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.
The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.
This Technical Data Notebook has been prepared in support of a Letter of Map Revision submittal to amend the 100-year floodplain, or Special Flood Hazard Area associated with Finger Rock Wash in Pima County, Arizona. The purpose of this LOMR application is to revise the effective Flood Insurance Rate Map SFHA boundaries based on updated and more detailed information. No new hydraulic structures are present within the study limits.
This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.
The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.
This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
This report was prepared to document surface water hydrology and floodplain conditions in accordance with current standards of practice. This information is intended to support issuance of building permits, re-approval of construction drawings to current standards, and issuance of floodplain use permits, if needed.
Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks that are desired to provide safe and convenient pedestrian and bicycle access and connectivity to select Santa Cruz Valley Unified School District No. 35 facilities as well as use for the general public for transportation and recreational purposes.