Matching Items (24)
Filtering by

Clear all filters

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

Created2010-06
Description

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the Colorado River Indian Tribes in meeting transportation needs for the Study Area into the future.

Created2011-02
Description

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways,

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways, nonmotorized transportation modes (bicycles and pedestrians), and transit components.

42925-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on average. In addition, the District’s plant operations cost per square foot and food service cost per meal were lower than peer districts’ averages. The District’s transportation program cost per pupil was higher than the peer districts’ average, but the program was efficient, with lower per mile costs. However, the District should improve some of its administrative practices. In particular, the District should strengthen controls over its cash handling, culinary arts program, and computer network and systems.

41217-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1923-10-13
Description

Letter from Carl Hayden to R.P Gilliland regarding the sale of Bright Angel Trail (Ariz.) and construction of the President's Highway from Maine, AZ to the Grand Canyon.

41224-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1924-12-16
Description

Letter from Carl Hayden to Fred S. Breen regarding Yaki Point, the sale of Bright Angel Trail and the building of a road between Maine and the Grand Canyon.

41347-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1924-03-25
Description

Letter of introduction for Dwight B. Heard on the arrival of National Park Service Director Stephen T. Mather to Phoenix. Mather's visit includes trips to Roosevelt Dam and Tumacácori.

41355-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1917-08-11
Description

Letter from Carl Hayden to W. W. Bass informing him that his contribution for maintaining the roads at the Grand Canyon has been reduced to $50 per year. Hayden also notes that no further action on national park status will be taken until December 1917 during the regular session of

Letter from Carl Hayden to W. W. Bass informing him that his contribution for maintaining the roads at the Grand Canyon has been reduced to $50 per year. Hayden also notes that no further action on national park status will be taken until December 1917 during the regular session of congress.

41363-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1915-10-12
Description

Letter from Carl Hayden to W. W. Bass informing Bass that he will not be able to go north to attend the Arizona Good Roads Association conference; however, he assures Bass that his rights as a land owner and miner will be protected.

41299-Thumbnail Image.png
ContributorsHayden, Carl T. (Author)
Created1935-02-19
Description

Letter from Carl Hayden to Arno B. Cammerer enclosing Ed Hamilton's request for the road between Grand Canyon Village and Rowe's Well to be updated.