Matching Items (8)
Filtering by

Clear all filters

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

Created2010-06
Description

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the Colorado River Indian Tribes in meeting transportation needs for the Study Area into the future.

Created2011-02
Description

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways,

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways, nonmotorized transportation modes (bicycles and pedestrians), and transit components.

42925-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on

In fiscal year 2011, Kingman Unified School District’s student achievement was similar to peer district averages, and it operated efficiently with lower costs than peer districts’, on average. The District operated its administration with lower per pupil costs because it employed fewer administrative staff per pupil than peer districts, on average. In addition, the District’s plant operations cost per square foot and food service cost per meal were lower than peer districts’ averages. The District’s transportation program cost per pupil was higher than the peer districts’ average, but the program was efficient, with lower per mile costs. However, the District should improve some of its administrative practices. In particular, the District should strengthen controls over its cash handling, culinary arts program, and computer network and systems.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

42847-Thumbnail Image.png
Created2009-05
Description

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.