Matching Items (16)
Filtering by

Clear all filters

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.