Matching Items (19)
Filtering by

Clear all filters

Created2009 to 2016
Description

This report, required by the National Highway Traffic Safety Administration provides an update of highway safety projects throughout the state of Arizona during the Federal Fiscal Year as administered by the Arizona Governor’s Office of Highway Safety.

Created2010 to 2017
Description

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety

The Office of Highway Safety produces the annual Highway Safety Plan to serve as the implementation guide for highway safety projects throughout Arizona. The Plan also is an application for funding through the National Highway Traffic Safety Administration. Project selection is data driven and utilizes state and national traffic safety data (e.g., crashes, fatalities, injuries, citations, etc.). Knowledge of the Arizona political, economic, and demographic environments, as well as highway safety expertise on the part of staff and other partners also are taken into account where appropriate.

117470-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body) / Coconino County (Ariz.) (Issuing body) / Burgess & Niple (Publisher)
Created2015-10
Description

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private land north of I-40 at Bellemont. Frequent congestion from heavy truck volumes and subdivision traffic causes traffic delays and creates concern for safety and timely emergency response. The 2008 closure of the ADOT Parks Rest Area on I-40, just west of Bellemont, has also increased vehicular traffic accessing the truck stop and restaurants. Future build-out of the subdivision and potential commercial/industrial uses in the area are expected to continue to negatively affect the Brannigan Park Road and Shadow Mountain Drive intersection and the I-40 traffic interchange. ADOT recently prepared the I-40 Bellemont to Winona Initial Design Concept Report, which recommended long-term improvements for the intersection and traffic interchange.

Ultimately, this access management and multimodal transportation study will provide a comprehensive review of the Bellemont area transportation system and provide guidance for determining priority needs for future improvements north of I-40, including alleviating congestion and improving/managing access, and improving and evaluating multimodal access to businesses from residential areas.

118126-Thumbnail Image.png
Created2016-07
Description
The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness

The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness of removing the trees, ADOT intends to conduct statistically rigorous before-after safety effectiveness analysis to estimate state-specific crash modification factors (CMFs).
118127-Thumbnail Image.png
Created2015-05
Description
Windblown dust events occur in Arizona, and blowing dust has been considered a contributing factor to serious crashes on ... Arizona roadways.... [T]he Arizona Department of Transportation (ADOT) acquires information about predicted or in-progress dust events through National Weather Service forecasts and advisories and through field reports from motorists and

Windblown dust events occur in Arizona, and blowing dust has been considered a contributing factor to serious crashes on ... Arizona roadways.... [T]he Arizona Department of Transportation (ADOT) acquires information about predicted or in-progress dust events through National Weather Service forecasts and advisories and through field reports from motorists and ADOT personnel. ADOT then communicates this information to the public.... During this project, researchers developed a set of recommendations that ADOT can implement to identify the most effective means for acquiring data about windblown dust events, communicating ... to the public, and influencing driver behavior....--Page v.
42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

Created1990 to 2009
Description

The five-year construction program is a budget of what Arizona expects to receive in funds from various sources and how it proposes to spend them project by project. The highways and airport programs will result in a better quality of life for all citizens.

ContributorsArizona. Department of Transportation (Issuing body) / Jacobs Engineering Group (Publisher)
Created2015-02
Description

Project Summary

Passing and climbing lanes provide additional lanes for vehicles to safely pass other vehicles while maintaining speeds. Implementing passing and climbing lane projects provides traffic operational and safety benefits at a cost that is far less than fully widening a highway. In an effort to enhance safety and mobility

Project Summary

Passing and climbing lanes provide additional lanes for vehicles to safely pass other vehicles while maintaining speeds. Implementing passing and climbing lane projects provides traffic operational and safety benefits at a cost that is far less than fully widening a highway. In an effort to enhance safety and mobility on Arizona's roadways, the Arizona Department of Transportation is currently updating the 2003 Passing and Climbing Lanes Prioritization Study. This update intends to further refine the identification and prioritization methodology previously utilized and to develop a prioritized list of candidate locations that would provide the most benefit to the traveling public.
Study Objectives

    Review previous studies and research current best practices.
    Analyze the safety and performance benefits of passing/climbing lanes constructed since the previous study.
    Develop a revised methodology and ranking criteria.
    Obtain feedback from ADOT District Engineers and other stakeholders, such as rural COGs and MPOs.
    Develop a new prioritized list of candidate passing/climbing lane projects.