Filtering by
- All Subjects: Hydrogeology
- All Subjects: Flood control
- All Subjects: Roads
- Creators: Pima County (Ariz.). County Administrator's Office
Reports on the development of a reconnaissance level numerical groundwater model of the Davidson Canyon and Cienega Creek watersheds. Includes recommendations for data that must be collected prior to completing environmental analyses for the proposed project.
The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.
This memorandum describes (1) the potential applicability to Pima County of a national initiative to institute reforms in floodplain management; and (2) an assessment of the effectiveness of Pima County's Riparian Habitat Mitigation Ordinance (attachment). An inter-departmental team was formed to formulate specific proposals for consideration as part of the Riparian Protection Element of the SDCP and the major plan amendment to the County's comprehensive plan.
The study details the direct and indirect impacts of roads on natural resources, including direct mortality and loss of habitat, physical changes to the topography and hydrology of an area, impacts to habitat, noise, light and other types of pollution, and habitat fragmentation.