Matching Items (10)
Filtering by

Clear all filters

Created2010 to 2011
Description

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and water chemistry. It also contains information on drought, erosion and repeat photography.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

43165-Thumbnail Image.png
Created2001-12
Description

The purpose of this report is to present the data gathered to date in the Santa Cruz AMA in support of the management goal and groundwater modeling effort. This report presents groundwater and surface water monitoring data, USGS stream gaging data, effluent data, gravity studies, historical water use and water

The purpose of this report is to present the data gathered to date in the Santa Cruz AMA in support of the management goal and groundwater modeling effort. This report presents groundwater and surface water monitoring data, USGS stream gaging data, effluent data, gravity studies, historical water use and water quality data for three distinctive stream reaches of the Santa Cruz River.

42847-Thumbnail Image.png
Created2009-05
Description

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.

42739-Thumbnail Image.png
Created2000-01
Description

This document and the Geographic Information System file that is now a part of the County library of over 1000 coverages, gives the scientific community access to mapping that better differentiates perennial, ephemeral and intermittent watercourses, and provides more comprehensive coverage of shallow groundwater sources. This data is significant because

This document and the Geographic Information System file that is now a part of the County library of over 1000 coverages, gives the scientific community access to mapping that better differentiates perennial, ephemeral and intermittent watercourses, and provides more comprehensive coverage of shallow groundwater sources. This data is significant because riparian habitat is one of the most important and least protected of the habitat types in Pima County.

42733-Thumbnail Image.png
Created2000-07
Description

The purpose of this project was to compile information on groundwater withdrawals and surface water diversions near perennial streams, intermittent streams, and shallow groundwater areas previously identified by PAG for the SDCP. The information could be used to prioritize future investigations of potential impacts of these withdrawals and diversions on

The purpose of this project was to compile information on groundwater withdrawals and surface water diversions near perennial streams, intermittent streams, and shallow groundwater areas previously identified by PAG for the SDCP. The information could be used to prioritize future investigations of potential impacts of these withdrawals and diversions on riparian and aquatic habitats for the SDCP.

42372-Thumbnail Image.png
Description

This report summarizes published reports and public datasets pertaining to the subsurface hydrology of Sopori Basin. It includes descriptions of the hydrogeology of the basin, recharge, the number and type of wells, well installation frequency, changes in water levels through time, shallow groundwater areas, groundwater pumping, grandfathered irrigation rights and

This report summarizes published reports and public datasets pertaining to the subsurface hydrology of Sopori Basin. It includes descriptions of the hydrogeology of the basin, recharge, the number and type of wells, well installation frequency, changes in water levels through time, shallow groundwater areas, groundwater pumping, grandfathered irrigation rights and water quality. Data sources and limitations also are discussed. This report is intended to provide a broad understanding of the groundwater conditions in Sopori Basin based on existing information.

42364-Thumbnail Image.png
Created2007-03
Description

Pima Association of Governments updated a portion of the Water Usage Along Selected Streams in Pima County, Arizona, which PAG created in 2000. The updated report and datasets show current potential water usage in these critical areas. Deliverables include the shapefiles, spreadsheets and maps that accompany this memorandum. The purpose

Pima Association of Governments updated a portion of the Water Usage Along Selected Streams in Pima County, Arizona, which PAG created in 2000. The updated report and datasets show current potential water usage in these critical areas. Deliverables include the shapefiles, spreadsheets and maps that accompany this memorandum. The purpose of this report is to provide updated information about the location and pumping history of wells located in Pima County near shallow groundwater areas, generally located near drainages.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.