Matching Items (9)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

42847-Thumbnail Image.png
Created2009-05
Description

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.

42011-Thumbnail Image.png
Created2009-05-11
Description

This addendum to the 2005 work plan identifies how additional assessment of groundwater features and contamination at Cave Creek Landfill will be conducted.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.