Matching Items (14)
Filtering by

Clear all filters

42441-Thumbnail Image.png
Created2011-03
Description

Scottsdale Road and Rural Road are identified in the Regional Transportation Plan as an arterial Bus Rapid Transit route. The portion of this route within Scottsdale is programmed and funded in the Transit Life Cycle Program.

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

Created1996 to 2007
Description

This report was commissioned by the City of Scottsdale and conducted by Behavior Research Center. The purpose of the study was to measure attitudes about the use of photo-based traffic enforcement statewide.

Created2003-04
Description

A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.

41876-Thumbnail Image.png
Created2014-08
Description

A study of a sample of individuals who contacted the Scottsdale Convention and Visitors Bureau from April 2013 to March 2014, to determine their travel patterns (length of stay, activities during stay, trip spending, etc.) and demographics.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.