Matching Items (16)
Filtering by

Clear all filters

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

Created2004 to 2013
Description

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in nonpoint source pollutant loadings and improvement in water quality resulting from program implementation.

Created2010 to 2011
Description

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and water chemistry. It also contains information on drought, erosion and repeat photography.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

42726-Thumbnail Image.png
Created2001-02
Description

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able

Conducted for the Pima County Flood Control District by the Pima Association of Governments in order to determine if stormflows on the Cienega Creek have changed over time when analyzed in terms of frequency, volume, and seasonallity. In a data search that extends back to the 1950s, they were able to determine the daily mean flow, the flows over base, and the annual peak flows of the Cienega Creek.