Filtering by
- All Subjects: Traffic safety
- All Subjects: Roads
- Creators: Arizona. Department of Transportation
Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private land north of I-40 at Bellemont. Frequent congestion from heavy truck volumes and subdivision traffic causes traffic delays and creates concern for safety and timely emergency response. The 2008 closure of the ADOT Parks Rest Area on I-40, just west of Bellemont, has also increased vehicular traffic accessing the truck stop and restaurants. Future build-out of the subdivision and potential commercial/industrial uses in the area are expected to continue to negatively affect the Brannigan Park Road and Shadow Mountain Drive intersection and the I-40 traffic interchange. ADOT recently prepared the I-40 Bellemont to Winona Initial Design Concept Report, which recommended long-term improvements for the intersection and traffic interchange.
Ultimately, this access management and multimodal transportation study will provide a comprehensive review of the Bellemont area transportation system and provide guidance for determining priority needs for future improvements north of I-40, including alleviating congestion and improving/managing access, and improving and evaluating multimodal access to businesses from residential areas.
The five-year construction program is a budget of what Arizona expects to receive in funds from various sources and how it proposes to spend them project by project. The highways and airport programs will result in a better quality of life for all citizens.
Project Summary
Passing and climbing lanes provide additional lanes for vehicles to safely pass other vehicles while maintaining speeds. Implementing passing and climbing lane projects provides traffic operational and safety benefits at a cost that is far less than fully widening a highway. In an effort to enhance safety and mobility on Arizona's roadways, the Arizona Department of Transportation is currently updating the 2003 Passing and Climbing Lanes Prioritization Study. This update intends to further refine the identification and prioritization methodology previously utilized and to develop a prioritized list of candidate locations that would provide the most benefit to the traveling public.
Study Objectives
Review previous studies and research current best practices.
Analyze the safety and performance benefits of passing/climbing lanes constructed since the previous study.
Develop a revised methodology and ranking criteria.
Obtain feedback from ADOT District Engineers and other stakeholders, such as rural COGs and MPOs.
Develop a new prioritized list of candidate passing/climbing lane projects.