Matching Items (6)
Filtering by

Clear all filters

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

42847-Thumbnail Image.png
Created2009-05
Description

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.

43571-Thumbnail Image.png
Created2008-10
Description

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

42513-Thumbnail Image.png
Created2010-05
Description

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major,

This study examines the feasibility of Turner Parkway and establishes guidance for the preservation of right-of-way to assure the functional integrity of the transportation framework. The Turner Parkway corridor is located 13 miles west of Loop 303 in northwestern Maricopa County. When completed, this parkway will be the first major, high-capacity, north-south facility west of White Tank Mountains.