Matching Items (166)
Filtering by

Clear all filters

41171-Thumbnail Image.png
ContributorsSteeves, X. N. (Author)
Created1924-03-20
Description

Letter from X. N. Steeves to Carl T. Hayden describing road conditions around the Grand Canyon National Park.

42961-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Contributor)
Created2009-12
Description

The 2009 Navajo Nation Long Range Transportation Plan is a twenty-year comprehensive plan developed and updated by the Navajo Division of Transportation in a five-year cycle. The plan identifies the Nation’s multi-modal transportation needs over the next 20 years and develops strategies to meet them. The plan provides long range

The 2009 Navajo Nation Long Range Transportation Plan is a twenty-year comprehensive plan developed and updated by the Navajo Division of Transportation in a five-year cycle. The plan identifies the Nation’s multi-modal transportation needs over the next 20 years and develops strategies to meet them. The plan provides long range planning policies and implementation strategies for the Navajo Indian Reservation Roads Program improvements. It is based on a comprehensive analysis of all pertinent factors and issues affecting the Navajo Nation’s existing and future transportation needs.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.

42142-Thumbnail Image.png
ContributorsCarr, Thomas (Contributor) / U.S. Fish and Wildlife Service (Contributor)
Created2010-12
Description

This report includes a preliminary description of water supplies that could possibly be acquired to meet water supply needs of the Arizona Water Banking Authority and the Central Arizona Project.

42133-Thumbnail Image.png
Created2014-09
Description

The objective of this study was to evaluate the effect of typical chemical winter maintenance practices on Arizona Department of Transportation pavements. A review of previous studies on the effect of deicing/anti‐icing chemicals did not yield definitive recommendations, especially for DIAICs typically used by ADOT. Researchers conducted a laboratory study

The objective of this study was to evaluate the effect of typical chemical winter maintenance practices on Arizona Department of Transportation pavements. A review of previous studies on the effect of deicing/anti‐icing chemicals did not yield definitive recommendations, especially for DIAICs typically used by ADOT. Researchers conducted a laboratory study evaluating the effects of magnesium chloride, potassium chloride, sodium chloride, and distilled water on eight different open‐graded rubber‐modified asphalt concrete mixes using the boiling test. All experimental factors were found to be statistically significant, and the researchers provide recommendations on which DIAICs should be used for different binder and aggregate types.

43166-Thumbnail Image.png
ContributorsNelson, Keith (Author) / Santa Cruz Active Management Area (Ariz.) (Publisher)
Created2007-02-26
Description

The model was developed as a tool to better understand the complex and interdependent stream-aquifer system, and to provide guidance for the management of regional water resources. Water management topics relevant to the Santa Cruz AMA include bi-national water issues and the reliability of water supplies. This model was primarily

The model was developed as a tool to better understand the complex and interdependent stream-aquifer system, and to provide guidance for the management of regional water resources. Water management topics relevant to the Santa Cruz AMA include bi-national water issues and the reliability of water supplies. This model was primarily calibrated over the recent effluent-dominated groundwater flow regime (1997-2002) because of the availability of high quality head, flow and pumping data. Thus, some model boundary conditions calibrated over recent periods may not necessarily be representative of pre-effluent conditions.

42847-Thumbnail Image.png
Created2009-05
Description

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.

42040-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Publisher)
Created1996-12
Description

The Groundwater Cleanup Task Force has examined various aspects of Arizona's cleanup programs as well as similar programs in other states and on the federal level. Its members have debated these issues in detail, and present this report as a summary of the Task Force's work and recommendations.

42034-Thumbnail Image.png
Created2007-03-30
Description

Each year, information is requested from cities, towns, private water companies, and water improvement districts in an effort to summarize and document water conservation activities implemented within Active Management Areas.

43571-Thumbnail Image.png
Created2008-10
Description

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.