Matching Items (162)
Created1998 to 1999
Description

This report is intended to provide useful information about the condition of the State Highway System in a format that is readily accessible to transportation professionals and non-professionals. This report was produced by the Planning Team of the Transportation Planning Division.

Created1990 to 2009
Description

The five-year construction program is a budget of what Arizona expects to receive in funds from various sources and how it proposes to spend them project by project. The highways and airport programs will result in a better quality of life for all citizens.

Created2006 to 2017
Description

The purpose of the Program is to set forth the plan for developing projects and account for the spending funds for the next five years. All projects in the first two years of the program will be fully funded and ready to advertise within the year programmed or sooner as

The purpose of the Program is to set forth the plan for developing projects and account for the spending funds for the next five years. All projects in the first two years of the program will be fully funded and ready to advertise within the year programmed or sooner as determined by the State Transportation Board. The last three years of the program will be illustrative in nature and be used to establish an implementation plan for projects moving through the various preparation phases needed prior to the construction of the project.

Created2009 to 2017
Description

Constitutes the Department's annual report and projected plans for the coming year. The report covers a five year period, but is issued annually.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.

118023-Thumbnail Image.png
Created1988-08
Description

This report describes a series of full-scale vehicular crash tests conducted to evaluate the impact performance of small sign supports used by the Arizona Department of Transportation (ADOT). The tests were conducted and evaluated in accordance with the recommendations of NCHRP Report 230 and the 1985 AASHTO "Standard Specifications for

This report describes a series of full-scale vehicular crash tests conducted to evaluate the impact performance of small sign supports used by the Arizona Department of Transportation (ADOT). The tests were conducted and evaluated in accordance with the recommendations of NCHRP Report 230 and the 1985 AASHTO "Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals."

117470-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body) / Coconino County (Ariz.) (Issuing body) / Burgess & Niple (Publisher)
Created2015-10
Description

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private land north of I-40 at Bellemont. Frequent congestion from heavy truck volumes and subdivision traffic causes traffic delays and creates concern for safety and timely emergency response. The 2008 closure of the ADOT Parks Rest Area on I-40, just west of Bellemont, has also increased vehicular traffic accessing the truck stop and restaurants. Future build-out of the subdivision and potential commercial/industrial uses in the area are expected to continue to negatively affect the Brannigan Park Road and Shadow Mountain Drive intersection and the I-40 traffic interchange. ADOT recently prepared the I-40 Bellemont to Winona Initial Design Concept Report, which recommended long-term improvements for the intersection and traffic interchange.

Ultimately, this access management and multimodal transportation study will provide a comprehensive review of the Bellemont area transportation system and provide guidance for determining priority needs for future improvements north of I-40, including alleviating congestion and improving/managing access, and improving and evaluating multimodal access to businesses from residential areas.