Matching Items (44)
Filtering by

Clear all filters

42436-Thumbnail Image.png
Created2007-10
Description

Develop a detailed operating plan for the freeway express/BRT routes identified in the Regional Transportation Plan as well as identify vehicle and infrastructure investments needed to support said routes.

42439-Thumbnail Image.png
Created2011-12
Description

Valley Metro periodically conducts surveys with Dial-A-Ride passengers to gather information on trip making, demographic, and rider satisfaction with transit services. Previous Dial-a-Ride studies were conducted in 2000, 2002, and 2007. Valley Metro commissioned WestGroup Research of Phoenix to conduct a telephone survey with valley DAR passengers.

42440-Thumbnail Image.png
Created2011-12
Description

Valley Metro commissioned WestGroup Research to conduct a mail survey with users of transit services that are alternatives to Dial-a-Ride. Respondents included users of cab coupon and voucher programs.

42442-Thumbnail Image.png
Created2008-04
Description

The Regional Transportation Plan and Proposition 400 identified funding for 13 regional parkand-ride lots to support transit operations. This study provides recommendations to ensure that park-and-ride implementation are aligned with operational requirements, especially regarding express bus and bus rapid transit needs. The Park-and-Ride Re-prioritization also describes issues concerning the Valley’s

The Regional Transportation Plan and Proposition 400 identified funding for 13 regional parkand-ride lots to support transit operations. This study provides recommendations to ensure that park-and-ride implementation are aligned with operational requirements, especially regarding express bus and bus rapid transit needs. The Park-and-Ride Re-prioritization also describes issues concerning the Valley’s overall park-and-ride network and makes recommendations to facilitate implementation.

42444-Thumbnail Image.png
Created2009-02
Description

From Oct. 8 through Dec. 18, 2007, RPTA conducted an Origin and Destination survey of the Valley Metro riders. The objectives were to examine the demographics and travel behavior characteristics of Valley Metro riders.

42449-Thumbnail Image.png
Created2001-06
Description

An Urban Design Team made up of local designers, national transit designers, and agency representatives, was assembled to develop a document that would guide the system design. In addition, a team of climatologists from Arizona State University researched the special performance needs of materials and cooling systems in our climate,

An Urban Design Team made up of local designers, national transit designers, and agency representatives, was assembled to develop a document that would guide the system design. In addition, a team of climatologists from Arizona State University researched the special performance needs of materials and cooling systems in our climate, providing input into the guidelines for shading and cooling devices, as well as a separate technical report. The Team worked to isolate the twenty elements of urban design most critical to the creation of a light rail system specific to this region and then developed guidelines for each one of those elements.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42982-Thumbnail Image.png
Created2013-06
Description

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the District employed more administrative positions per pupil. The District’s plant operations, food service, and transportation programs operated reasonably efficiently, with cost measures such as cost per square foot, cost per meal, and cost per mile that were similar to or lower than peer districts’ averages. However, the District needs to improve controls over access to critical information systems and strengthen controls over its fuel purchase cards.

42934-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Elfrida Elementary School District’s student AIMS scores for reading and writing were similar to the peer districts’ averages, and its math scores were lower. The District’s operational efficiencies compared favorably to peer district averages in most areas. All of the District’s nonclassroom areas operated with lower

In fiscal year 2011, Elfrida Elementary School District’s student AIMS scores for reading and writing were similar to the peer districts’ averages, and its math scores were lower. The District’s operational efficiencies compared favorably to peer district averages in most areas. All of the District’s nonclassroom areas operated with lower per pupil costs than peer districts’ averages and were reasonably efficient overall considering the District’s small size. However, the District’s transportation cost per mile was 59 percent higher than the peer districts’ average, partly because of slightly higher staffing levels. Providing transportation services cooperatively with neighboring districts could help bring costs closer to the peer district average. Further, the District needs to strengthen its accounting and computer controls.

42828-Thumbnail Image.png
Created2013-12
Description

In fiscal year 2011, Pearce Elementary School District’s student AIMS scores were similar to peer districts’ averages. Although per pupil costs were high in some operational areas, the District was reasonably efficient overall. Pearce ESD’s per pupil administration costs were similar to the peer districts’ average, and although its plant

In fiscal year 2011, Pearce Elementary School District’s student AIMS scores were similar to peer districts’ averages. Although per pupil costs were high in some operational areas, the District was reasonably efficient overall. Pearce ESD’s per pupil administration costs were similar to the peer districts’ average, and although its plant operations, food service, and transportation program operated with higher per pupil costs than peer districts, these areas operated in a reasonably efficient manner considering factors such as the age of the District’s buildings, number of meals served, and transportation miles driven. Although relatively efficient, the District should strengthen some of its accounting controls, including ensuring proper separation of duties for its payroll and purchasing processes and ensuring purchases are properly approved before they are made. The District should also strengthen some of its computer controls, such as the requirements for network passwords.