Filtering by
- All Subjects: Tourism
- All Subjects: Drainage
- All Subjects: Airports
- All Subjects: Water use
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Creators: The Pride Publishing Company
- Creators: Evans, R. T.
The Cochise County Airport is playing an increasing role in the promotion and development of the City of Willcox and the Cochise County area. The master plan has a capital improvement program that responds to the needs and desires for the short and long term aviation forecasts for Cochise County.
The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport from residential encroachment and the aggressive economic development of the Airpark area.
A study of a sample of individuals who contacted the Scottsdale Convention and Visitors Bureau from April 2013 to March 2014, to determine their travel patterns (length of stay, activities during stay, trip spending, etc.) and demographics.
This update of the Eric Marcus Municipal Airport Master Plan has been undertaken to evaluate the airport’s capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of the master plan is to provide systematic guidelines for the airport’s overall development, operation, and ownership.
Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.
Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.
This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.
A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in nonpoint source pollutant loadings and improvement in water quality resulting from program implementation.
The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.