Matching Items (348)
Filtering by

Clear all filters

41090-Thumbnail Image.png
ContributorsCureton, T. H. (Author)
Created1918-05-01
Description

Letter from Thomas Henry Cureton to Carl Hayden expressing a lack of interest in establishing the Grand Canyon as a national park.

42272-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Contributor)
Created2008-10
Description

The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.

Created2014-03-14
Description

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on the Navajo Nation. The study was funded by the Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division's Planning Assistance for Rural Areas (PARA) program. The study was initiated to develop a planning strategy to improve the mobility and safety within the Fort Defiance Industrial Area.

43041-Thumbnail Image.png
Created2012-03
Description

Land Use and Traffic Congestion is an investigation into the links among land use, travel behavior, and traffic congestion. Researchers focused on four transportation corridors in the Phoenix area: three older neighborhoods with relatively mixed, higher density land use, and one suburban area with lower density but high traffic volumes.

Land Use and Traffic Congestion is an investigation into the links among land use, travel behavior, and traffic congestion. Researchers focused on four transportation corridors in the Phoenix area: three older neighborhoods with relatively mixed, higher density land use, and one suburban area with lower density but high traffic volumes. The analysis suggested that the higher density corridors exhibited less congestion due to the greater mix of uses, shorter trip lengths, more travel by transit and non-motorized modes, and the presence of a secondary street grid system.

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

Created2003 to 2012
Description

The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to

The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to the State Lake Improvement Fund. The information on recreational watercraft usage patterns on Arizona’s lakes and rivers is necessary, in part, to determine the distribution of SLIF funds to applicants.

42617-Thumbnail Image.jpg
Created2001-10
Description

In order to work effectively, concurrency requirements and level of service standards mus be an integral part of long term planning and the development review process. To create incentives for density, affordable housing, and mixed use development, staff will propose the application of lower level of service standards for land

In order to work effectively, concurrency requirements and level of service standards mus be an integral part of long term planning and the development review process. To create incentives for density, affordable housing, and mixed use development, staff will propose the application of lower level of service standards for land use types appropriate to certain growth areas.