Matching Items (34)
Filtering by

Clear all filters

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.

42460-Thumbnail Image.png
Created2000-08
Description

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route alternatives. The purpose of this study is to provide technical assistance, not to evaluate or select a preferred route alternative.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42937-Thumbnail Image.png
Created2009-07-31
Description

The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under

The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under the direction of a Technical Advisory Committee, which included representatives from Graham County, City of Safford, Town of Thatcher, Town of Pima, Southeastern Arizona Governments Organization, and ADOT.

42938-Thumbnail Image.png
Created1998-12
Description

In 1992, Graham County conducted a transportation study for the Gila Valley Region. This study prepared a long-range transportation plan and a transportation improvement program. Many of the improvements have been completed. The purpose of this study is to update the 1992 transportation plan and to address the current issues

In 1992, Graham County conducted a transportation study for the Gila Valley Region. This study prepared a long-range transportation plan and a transportation improvement program. Many of the improvements have been completed. The purpose of this study is to update the 1992 transportation plan and to address the current issues within the area.

42538-Thumbnail Image.png
Created2014-01
Description

The principal purpose of the Gila County Transportation Study is to identify the most critical transportation infrastructure needs within Gila County and recommend a program of improvement projects to address these needs. Transportation needs were grouped into the following elements: roadway, safety, pavement management, bicycle and pedestrian facilities, and transportation

The principal purpose of the Gila County Transportation Study is to identify the most critical transportation infrastructure needs within Gila County and recommend a program of improvement projects to address these needs. Transportation needs were grouped into the following elements: roadway, safety, pavement management, bicycle and pedestrian facilities, and transportation finance.

42569-Thumbnail Image.png
Created2003-06-13
Description
This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues

This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP.
42814-Thumbnail Image.png
Created2012-09
Description

The purpose of this report is to provide a proof of concept for a different, alternative method for evaluating police agencies. Our method is couched in a comparative approach, which will allow agencies to compare their performance to other police agencies. This report assesses police performance through the perceptions and

The purpose of this report is to provide a proof of concept for a different, alternative method for evaluating police agencies. Our method is couched in a comparative approach, which will allow agencies to compare their performance to other police agencies. This report assesses police performance through the perceptions and experiences of recently booked arrestees. By comparing the perceptions and experiences of recently booked arrestees from different jurisdictions we can begin to contextualize results and observe differences that might serve as an early warning of a problem or serve as an indicator of success.

42815-Thumbnail Image.png
Created2012-09
Description

The analysis plan and the format of this report are derived from numerous meetings held over more than an eighteen month span with the AARIN project advisory board, Maricopa County leadership, and representatives from MCSO. Following the guidance of the advisory board, the dissemination strategy for the AARIN project shifted

The analysis plan and the format of this report are derived from numerous meetings held over more than an eighteen month span with the AARIN project advisory board, Maricopa County leadership, and representatives from MCSO. Following the guidance of the advisory board, the dissemination strategy for the AARIN project shifted from a single, broadly scoped annual summary report supplemented by smaller topic-specific reports into shorter, individual reports tailored to the specific needs and wants of six key county criminal justice agencies. Meetings with MCSO representatives regarding their individualized report indicated they would be most interested in a broad analysis akin to the old annual reports. Given the MCSO’s need for the broadly scoped analysis as opposed to a topically-focused and interpretive report, the report here primarily provides analyses across most of the core instrument elements, presented in tabular form, with a list of key findings and highlights.

42786-Thumbnail Image.png
Created2000-05
Description

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous peoples of the historical period; and (4) Pima County today.