Matching Items (14)
Filtering by

Clear all filters

Created2014-06
Description

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second

This Campaign Effectiveness Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2013-2014 Clean Air and Clean Stormwater Program Campaigns. This project analyzed and tracked the overall effectiveness of the Clean Air Program after 24 campaign sessions. For the second consecutive year, the survey also measured and tracked attitudes, knowledge, awareness, and behaviors related to stormwater management for the Clean Stormwater Program Campaign.

Created2013-06
Description

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study,

This Campaign Effectiveness Travel Behavioral Study, conducted for the Pima County Department of Environmental Quality, was designed to evaluate the specific effectiveness of the 2012-2013 Clean Air Campaign, as well as analyze the overall effectiveness of the air quality media campaign after 23 campaign sessions. New to the current study, the survey also measured baseline awareness/knowledge related to storm water and hazardous waste issues.

Created2007-10-12
Description

Purpose of this report is to provide a detailed analysis of the runoff characteristics of the Diamond Bell Ranch area.To this end, HEC-HMS models were generated to analyze the runoff under existing watershed conditions.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42244-Thumbnail Image.png
Created2009-12
Description

This plan was undertaken by the Arizona Department of Transportation Multimodal Planning Division Aeronautics Group to evaluate and recommend a terminal area layout to meet anticipated terminal area demands.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.