Matching Items (9)
Filtering by

Clear all filters

42244-Thumbnail Image.png
Created2009-12
Description

This plan was undertaken by the Arizona Department of Transportation Multimodal Planning Division Aeronautics Group to evaluate and recommend a terminal area layout to meet anticipated terminal area demands.

43635-Thumbnail Image.png
Created2003-08-04
Description

With the advent of multi-modal transportation planning, and given that most of the major metropolitan areas in Arizona have implemented bicycle and pedestrian plans, it is now desirable that ADOT develop a bicycle and pedestrian plan that encompasses all of Arizona. The major intent of the Statewide Bicycle and Pedestrian

With the advent of multi-modal transportation planning, and given that most of the major metropolitan areas in Arizona have implemented bicycle and pedestrian plans, it is now desirable that ADOT develop a bicycle and pedestrian plan that encompasses all of Arizona. The major intent of the Statewide Bicycle and Pedestrian Plan is to provide a long-term plan for a system of shared roadways and bicycle and pedestrian facilities for the ADOT State Highway System. This includes the definition of the roles of the State and local government in the continual development of the bicycle and pedestrian transportation system in Arizona. It also includes the identification of all existing bicycle and pedestrian plans of the MPOs within Arizona to address the relationship between ADOT and the jurisdictions in the advancement of these plans. In addition, this plan includes design and maintenance guidelines for consideration by all implementing agencies in Arizona. Most importantly, this statewide bicycle and pedestrian plan guides ADOT in making transportation decisions impacting bicycling and pedestrian activity, and improves the accommodation of these non-motorized modes of transportation within Arizona’s multi-modal transportation system.

43634-Thumbnail Image.png
Created2004-12
Description

The Statewide Bicycle and Pedestrian Phase II Plan focuses on implementing some of the main recommendations of the Statewide Bicycle and Pedestrian Phase I Plan. This includes the development of documents for statewide distribution, the development of plans for a number of future programs, and significant improvements to the Bicycle

The Statewide Bicycle and Pedestrian Phase II Plan focuses on implementing some of the main recommendations of the Statewide Bicycle and Pedestrian Phase I Plan. This includes the development of documents for statewide distribution, the development of plans for a number of future programs, and significant improvements to the Bicycle and Pedestrian Program website.

43633-Thumbnail Image.png
Created2007-01-30
Description

This document provides a summary of activities completed in support of Phase III of the Arizona Statewide Bicycle and Pedestrian Program. The purpose of Phase III was to implement recommendations from the Arizona Statewide Bicycle and Pedestrian Plan Phase I and Phase II.

43571-Thumbnail Image.png
Created2008-10
Description

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information

A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.

42727-Thumbnail Image.png
Created2001-02
Description

Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.

42723-Thumbnail Image.png
Created2001-05
Description

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do

Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.

41889-Thumbnail Image.png
Created2009
Description

A master plan for bicycle facilities in the city of Yuma, giving an overview of existing facilities, outlining elements of the new master plan, and providing standards and phased goals for the new facilities.

67293-Thumbnail Image.png
Created1986-04
Description

Cooperative National Park Resources Studies Unit for University of Arizona, effects on Glen Canyon Dam releases on Grand Canyon River trips, a technical report, vol. no. 16.