Filtering by
- All Subjects: Flagstaff (Ariz.)
- All Subjects: Water-supply
- All Subjects: Grand Canyon National Park (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
- Resource Type: Text
The wild land/urban interface is a concern in Coconino County because of the potential for wild land fuels to ignite combustible structures and vice-versa. Destroying homes, property, and trees is just one way that wildfire harms an area. Wildfires can destroy habitat, soils, and forest health, disrupting economic stability, transportation corridors, recreation opportunities, water supplies, and scenery, as well as undermining a community’s emotional and spiritual well-being. Reducing the threat of catastrophic wildfire is a priority in the wild land/urban interface. This plan outlines actions needed to prepare and equip the greater Flagstaff community to live and thrive within our fire-adapted ponderosa pine forests.
This plan was undertaken by the Arizona Department of Transportation Multimodal Planning Division Aeronautics Group to evaluate and recommend a terminal area layout to meet anticipated terminal area demands.
The Flagstaff Regional Five-Year and Long Range Transit Plan proposes a long-term vision for Flagstaff’s regional public transportation system and identifies and establishes a short-, mid-, and long-term service plan; funding plan; and implementation plan.
Assesses Flagstaff's vulnerability to natural and human caused hazards and develops strategies to reduce the risks associated with those hazards.
Evaluates Pulliam Airport's capabilities and role, forecasts future aviation demand and plans for the timely development of new or expanded facilities to meet demand.
A compilation of conceptual designs for three redevelopment sites (Southside Warehouse, Downtown Gateway West, and Gateway East) in Flagstaff, Arizona.
A landmark assessment of infrastructure needs in Arizona was produced by the L. William Seidman Research Institute in May 2008 for the Arizona Investment Council (AIC): "Infrastructure Needs and Funding Alternatives for Arizona: 2008-2032", that addressed infrastructure needs in four categories: energy, telecommunications, transportation, and water and wastewater. The information from the AIC report is a major input to the report that follows. Other types of infrastructure — most notably education, health care, and public safety — also are analyzed here to provide a more complete picture of infrastructure needs in Arizona. The goals of this report are to place Arizona’s infrastructure needs into national and historical contexts, to identify the changing conditions in infrastructure provision that make building Arizona’s infrastructure in the future a more problematic proposition than in the past, and to provide projections of the possible costs of providing infrastructure in Arizona over the next quarter century.
Concerns research into the origin of water sustaining the Bingham Cienega. For purposes of long term management, we need to understand what the source of water is for the various riparian areas.
Provides basic information about the source of surface water in Cienega Creek at the downstream end of the natural preserve, which will contribute to efforts to conceptualize and implement effective land management proposals for the SDCP. Study results indicate that the surface flow or subflow from Agua Verde Creek do not significantly influence the water in the Cienega Creek.
A plan for the development of the McMillan Mesa Village, a 146 acre site on Switzer Mesa in Flagstaff, Arizona.