Matching Items (16)
Filtering by

Clear all filters

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42847-Thumbnail Image.png
Created2009-05
Description

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an

The purpose of the Verde Valley Multimodal Transportation Study is to develop a long-range regional transportation plan to guide the implementation of transportation improvements on the roads of regional significance in the Verde Valley, including I-17, State Routes, and roads on the County Regional Road System. This Study is an update of the 1999 Verde Valley Transportation Study Update.

43024-Thumbnail Image.png
Created2007-03
Description

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides

The Arizona Department of Transportation has been involved with railroad planning since 1976, with its first State Rail Plan Update issued in 1978. The most recent report, the 2000 Arizona State Rail Plan Update was an important starting point for this Inventory and Assessment in that the seven-year-old study provides the description and inventory of Arizona railroads as they existed at that time. There have been a number of important changes over the intervening years, and these are reflected in this 2007 Inventory and Assessment. In addition to the 2000 State Rail Plan Update, RLBA made use of the 2003 Maricopa Association of Governments (MAG) High-Capacity Transit Study and the 1998 Arizona High Speed Rail Feasibility Study. The information contained in this report was gathered from a number of sources, including the railroads themselves, ADOT, the Arizona Corporation Commission, MAG and numerous Arizona officials. A listing of persons who contributed to this Railroad Inventory and Assessment is provided under “Acknowledgements” inside the front cover. Information in this report also was obtained from the Association of American Railroads and from RLBA’s extensive data banks.