Matching Items (103)
Filtering by

Clear all filters

42328-Thumbnail Image.png
Created1996-09-06
Description

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated,

Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.

42329-Thumbnail Image.png
Created1994-07-01
Description

This report was prepared to document surface water hydrology and floodplain conditions in accordance with current standards of practice. This information is intended to support issuance of building permits, re-approval of construction drawings to current standards, and issuance of floodplain use permits, if needed.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42285-Thumbnail Image.png
Created2012-03-20
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Via Entrada Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Via Entrada Wash using better

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Via Entrada Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Via Entrada Wash using better topographic, hydrologic, and hydraulic data.

42286-Thumbnail Image.png
Created2011-02-21
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Campbell Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Campbell Wash using better topographic, hydrologic,

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Campbell Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Campbell Wash using better topographic, hydrologic, and hydraulic data.