Matching Items (383)
Filtering by

Clear all filters

Created2010-08
Description

The purpose of the study is to assist counties, cities, towns, and tribal communities in addressing a broad range of multimodal transportation planning issues including roadway and non-motorized modes of travel. The principal purpose is to evaluate existing transportation deficiencies, recommend needed improvements, and develop a transportation plan to accommodate

The purpose of the study is to assist counties, cities, towns, and tribal communities in addressing a broad range of multimodal transportation planning issues including roadway and non-motorized modes of travel. The principal purpose is to evaluate existing transportation deficiencies, recommend needed improvements, and develop a transportation plan to accommodate and guide future growth. The study will result in a Major Streets and Routes Plan that will serve as a guide to the development of the Town’s roadway network that will be constructed to meet anticipated development in the Town.

Created2012-09
Description

This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and

This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and the work products developed throughout the planning process, which forms the basis for the final plan recommendations. The planning process analyzed the existing transportation system, land use and socioeconomic conditions within the study area; conducted in-depth local stakeholder interviews; developed future growth projections; provided opportunities for public input; and included an evaluation of alternative future solutions.

Created2010-06
Description

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the

The La Paz Transportation Planning Study was conducted as part of the Planning Assistance for Rural Areas program sponsored by the Arizona Department of Transportation Multimodal Planning Division. This Study developed 5, 10, and 20-year transportation plans, as well as an implementation program, to guide the County, Towns, and the Colorado River Indian Tribes in meeting transportation needs for the Study Area into the future.

Created2011-02
Description

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways,

ADOT, in cooperation with the City of Kingman and Mohave County, initiated the Kingman Area Transportation Study Update to update the 2005 Kingman Area Transportation Study. The study provides a plan of improvements for 5-year (short-range), 10-year (mid-range), and 20-year (long-range) transportation planning horizons. The recommendations are multimodal, considering roadways, nonmotorized transportation modes (bicycles and pedestrians), and transit components.

Created2012-11
Description

The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan

The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan for 44 species that may be impacted as a result of the otherwise lawful activities of Pima County and its development community. The Incidental Take Permit, also called a Section 10 permit, will be for 30 years. This MSCP is part of the required documentation needed to receive an Incidental Take Permit under Section 10(a)(1)(B) of the ESA.

Created2005-02-03
Description

The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community

The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community and committee members. A public process will be conducted so that during 200t the document can be finalized and submitted to the U.S. Fish and Wildlife Service as part of the application for a federal endangered species permit.

Created2001
Description

Newsletter with information you should know about the Sonoran Desert Conservation Plan and Comprehensive Land Use Plan.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.