Filtering by
- All Subjects: Floodplain management
- Resource Type: Text
Selected article titles: KOLD-TV to Present Rebuttal; Proposed Nat Dem Platform; Gay Pride Week Update; Gay Pride Week Kicks Off With TKO Art Show; Casa Choir Creates Commotion in Tucson.
Selected article titles: Tucson "Gay Pride" Committee to Meet; MCC/Phoenix Rallies Against Washington for Jesus; Perspective: Developing a Gay Identity; Gays and Friends Help Send Five Delegates to Phoenix Democratic Convention; CCR Legislative Report.
Selected article titles: Tucson Lesbian Theater Performs in May; Gay Theater Auditions in Phoenix; Tucson Gay Pride Committee Formed; Perspective: Developing a Gay Identity; Phoenix Fairy Tales.
The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.
The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Concentration Points for the Unnamed Wash 12, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data.
This Technical Data notebook has been prepared to study a portion of the Pegler Wash located in Pima County, Arizona. The objective of the TDN is provide regulatory discharge rates and floodplain limits along the Pegler Wash using better topographic, hydrologic, and hydraulic data.
This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.
Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.
The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.