Matching Items (485)
Filtering by

Clear all filters

42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

42272-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Contributor)
Created2008-10
Description

The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.

78479-Thumbnail Image.png
Created1866-05-20
Description
This is a second labor contract that was shared between Jose, a Chinese settler, and his owner, Luis de Alda. He was brought to Cuba to serve as an indentured servants and the term of the contract was for six months. Details regarding Jose's wage, food, clothes, and work hours

This is a second labor contract that was shared between Jose, a Chinese settler, and his owner, Luis de Alda. He was brought to Cuba to serve as an indentured servants and the term of the contract was for six months. Details regarding Jose's wage, food, clothes, and work hours were stipulated in the document. 1866. Signed in Chinese.