Matching Items (29)
Filtering by

Clear all filters

42436-Thumbnail Image.png
Created2007-10
Description

Develop a detailed operating plan for the freeway express/BRT routes identified in the Regional Transportation Plan as well as identify vehicle and infrastructure investments needed to support said routes.

42439-Thumbnail Image.png
Created2011-12
Description

Valley Metro periodically conducts surveys with Dial-A-Ride passengers to gather information on trip making, demographic, and rider satisfaction with transit services. Previous Dial-a-Ride studies were conducted in 2000, 2002, and 2007. Valley Metro commissioned WestGroup Research of Phoenix to conduct a telephone survey with valley DAR passengers.

42440-Thumbnail Image.png
Created2011-12
Description

Valley Metro commissioned WestGroup Research to conduct a mail survey with users of transit services that are alternatives to Dial-a-Ride. Respondents included users of cab coupon and voucher programs.

42442-Thumbnail Image.png
Created2008-04
Description

The Regional Transportation Plan and Proposition 400 identified funding for 13 regional parkand-ride lots to support transit operations. This study provides recommendations to ensure that park-and-ride implementation are aligned with operational requirements, especially regarding express bus and bus rapid transit needs. The Park-and-Ride Re-prioritization also describes issues concerning the Valley’s

The Regional Transportation Plan and Proposition 400 identified funding for 13 regional parkand-ride lots to support transit operations. This study provides recommendations to ensure that park-and-ride implementation are aligned with operational requirements, especially regarding express bus and bus rapid transit needs. The Park-and-Ride Re-prioritization also describes issues concerning the Valley’s overall park-and-ride network and makes recommendations to facilitate implementation.

42444-Thumbnail Image.png
Created2009-02
Description

From Oct. 8 through Dec. 18, 2007, RPTA conducted an Origin and Destination survey of the Valley Metro riders. The objectives were to examine the demographics and travel behavior characteristics of Valley Metro riders.

42449-Thumbnail Image.png
Created2001-06
Description

An Urban Design Team made up of local designers, national transit designers, and agency representatives, was assembled to develop a document that would guide the system design. In addition, a team of climatologists from Arizona State University researched the special performance needs of materials and cooling systems in our climate,

An Urban Design Team made up of local designers, national transit designers, and agency representatives, was assembled to develop a document that would guide the system design. In addition, a team of climatologists from Arizona State University researched the special performance needs of materials and cooling systems in our climate, providing input into the guidelines for shading and cooling devices, as well as a separate technical report. The Team worked to isolate the twenty elements of urban design most critical to the creation of a light rail system specific to this region and then developed guidelines for each one of those elements.

42460-Thumbnail Image.png
Created2000-08
Description

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route

The Arizona Department of Transportation and the Maricopa Association of Governments are cooperating in the designation of a specific route for the CANAMEX Corridor in the Maricopa Region. Kimley-Horn and Associates, under contract to ADOT, provided technical assistance to ADOT and MAG in support of the high-level evaluation of route alternatives. The purpose of this study is to provide technical assistance, not to evaluate or select a preferred route alternative.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42814-Thumbnail Image.png
Created2012-09
Description

The purpose of this report is to provide a proof of concept for a different, alternative method for evaluating police agencies. Our method is couched in a comparative approach, which will allow agencies to compare their performance to other police agencies. This report assesses police performance through the perceptions and

The purpose of this report is to provide a proof of concept for a different, alternative method for evaluating police agencies. Our method is couched in a comparative approach, which will allow agencies to compare their performance to other police agencies. This report assesses police performance through the perceptions and experiences of recently booked arrestees. By comparing the perceptions and experiences of recently booked arrestees from different jurisdictions we can begin to contextualize results and observe differences that might serve as an early warning of a problem or serve as an indicator of success.

42815-Thumbnail Image.png
Created2012-09
Description

The analysis plan and the format of this report are derived from numerous meetings held over more than an eighteen month span with the AARIN project advisory board, Maricopa County leadership, and representatives from MCSO. Following the guidance of the advisory board, the dissemination strategy for the AARIN project shifted

The analysis plan and the format of this report are derived from numerous meetings held over more than an eighteen month span with the AARIN project advisory board, Maricopa County leadership, and representatives from MCSO. Following the guidance of the advisory board, the dissemination strategy for the AARIN project shifted from a single, broadly scoped annual summary report supplemented by smaller topic-specific reports into shorter, individual reports tailored to the specific needs and wants of six key county criminal justice agencies. Meetings with MCSO representatives regarding their individualized report indicated they would be most interested in a broad analysis akin to the old annual reports. Given the MCSO’s need for the broadly scoped analysis as opposed to a topically-focused and interpretive report, the report here primarily provides analyses across most of the core instrument elements, presented in tabular form, with a list of key findings and highlights.