Matching Items (185)
Created2002 to 2015
Description

By establishing the District, the Arizona State Legislature created an entity charged with keeping county residents safe from flood hazards and established an independent funding source for essential projects. The District is a municipal corporation and political subdivision of the State of Arizona. The Maricopa County Board of Supervisors doubles

By establishing the District, the Arizona State Legislature created an entity charged with keeping county residents safe from flood hazards and established an independent funding source for essential projects. The District is a municipal corporation and political subdivision of the State of Arizona. The Maricopa County Board of Supervisors doubles as the District's Board of Directors and receives counsel from the Flood Control Advisory Board comprised of county citizens.

42314-Thumbnail Image.png
Created2003-10-01
Description

This report documents the existing drainage conditions related to Silverbell Trails Estates roadways and 100-year flow depths and includes qualitative and quantitative analyses of the existing hydrologic and hydraulic conditions.

42315-Thumbnail Image.png
Created2007-08-08
Description

The purpose of this study is to provide uniformity in how building permits are processed and development is regulated within sheet flood areas in order to ensure that improvements are adequately protected from flood hazards.

42316-Thumbnail Image.png
Created2003-12-30
Description

The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42320-Thumbnail Image.png
Created2000-07-24
Description

Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.

42321-Thumbnail Image.png
Created2000-10-06
Description

The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.