Filtering by
- All Subjects: Pima County (Ariz.)
- All Subjects: Cosanti Foundation (Scottsdale, Ariz.)
- All Subjects: Gays and sports
- All Subjects: Mount Meru
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.
Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.
The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.
The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.
This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.
This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.
Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.