Matching Items (2)
Filtering by

Clear all filters

42556-Thumbnail Image.png
Created2007-08-08
Description

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the

The Augusta Resources Corporation proposes to construct the Rosemont Mine project in the northern Santa Rita Mountains. This report is a reconnaissance analysis of the conceptual flow and water balance in the area. The conceptual flow model for the area is based on topography, geology and precipitation and identifies the likely flow paths in the watershed and aquifer system. The water balance includes estimates of recharge to and groundwater flow from the area; there is no evapotranspiration discharge from the regional groundwater.

42407-Thumbnail Image.png
Created2009-06-23
Description

The purpose of the U.S. Highway 93 Corridor Area Plan is to recognize the unique character of the highway corridor and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan, the residents and the property owners. The U.S. Highway 93 Corridor Area

The purpose of the U.S. Highway 93 Corridor Area Plan is to recognize the unique character of the highway corridor and to encourage land use patterns that are consistent with the goals of the Mohave County General Plan, the residents and the property owners. The U.S. Highway 93 Corridor Area Plan, a component of the General Plan, covers approximately 430 square miles of unincorporated land in Mohave County.