Filtering by
- All Subjects: Flood control
- All Subjects: Universities and colleges--Graduation Requirements
- All Subjects: Gay columns in newspapers
- Resource Type: Text
This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”
The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.
Amendments to the bill establishing the Grand Canyon a National Monument. Circa 1908.
Letter from W. W. Bass to Carl Hayden requesting the boundaries of the park be reconsidered as a large portion of the land is suitable for mining and farming.
Letter from Carl Hayden to W. W. Bass concerning the passing of the national park bill. Hayden states that he will try to make the bill as advantageous to Arizona miners and farmers as possible, but the land will either remain as a national monument or become a national park. A postscript is added concerning the land allocated for the Havasupai Tribe.