Matching Items (664)
Filtering by

Clear all filters

42316-Thumbnail Image.png
Created2003-12-30
Description

The purpose of this study is to determine the hydrologic and hydraulic impacts of the Aspen Fire of the summer of 2003 on the Sabino Canyon and Carter Canyon watersheds, which are in the vicinity of the Town of Summerhaven, located on Mount Lemmon in the Santa Catalina Mountains, Arizona.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42320-Thumbnail Image.png
Created2000-07-24
Description

Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.

42321-Thumbnail Image.png
Created2000-10-06
Description

The purpose of this study is to develop a physical, process-based hydrologic model for the Finger Rock Wash watershed. A HEC-1 model was developed to estimate the 100-year discharge rate.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42323-Thumbnail Image.png
Created1999-01
Description

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.