Matching Items (32)
Filtering by

Clear all filters

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.

42320-Thumbnail Image.png
Created2000-07-24
Description

Work maps for the Mission Wash floodplain. Highlighted photographs show the floodplain limits and watersheds.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42323-Thumbnail Image.png
Created1999-01
Description

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the

This request for a Physical Map Revision is for a reach of Camino de Oeste Wash from Foret Road to Camino De Oeste Road. This PMR is to reflect improved topographical data available subsequent to the Flood Insurance Study of this area, and to establish base flood elevations for the floodplain.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.