Matching Items (395)
Filtering by

Clear all filters

Created2012-11
Description

The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan

The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan for 44 species that may be impacted as a result of the otherwise lawful activities of Pima County and its development community. The Incidental Take Permit, also called a Section 10 permit, will be for 30 years. This MSCP is part of the required documentation needed to receive an Incidental Take Permit under Section 10(a)(1)(B) of the ESA.

Created2005-02-03
Description

The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community

The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community and committee members. A public process will be conducted so that during 200t the document can be finalized and submitted to the U.S. Fish and Wildlife Service as part of the application for a federal endangered species permit.

Created2001
Description

Newsletter with information you should know about the Sonoran Desert Conservation Plan and Comprehensive Land Use Plan.

ContributorsArizona. Department of Transportation (Contributor)
Created2012-05-21
Description

The proposed action is the construction and operation of a new multilane freeway in the metropolitan Phoenix area extending approximately 22 to 24 miles from Interstate 10 west of Phoenix to Interstate 10 southeast of Phoenix. The facility would be the final extension of State Route 202L, an element of

The proposed action is the construction and operation of a new multilane freeway in the metropolitan Phoenix area extending approximately 22 to 24 miles from Interstate 10 west of Phoenix to Interstate 10 southeast of Phoenix. The facility would be the final extension of State Route 202L, an element of the Maricopa Association of Governments' adopted Regional Freeway and Highway System.

Created2012-05
Description

In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a public education project about sustainable communities and transit-oriented development along the Metro Light Rail in Phoenix, Tempe, and Mesa, Arizona. The resulting reports present neighborhood analyses and transit-oriented development issues for eight light rail stations selected

In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a public education project about sustainable communities and transit-oriented development along the Metro Light Rail in Phoenix, Tempe, and Mesa, Arizona. The resulting reports present neighborhood analyses and transit-oriented development issues for eight light rail stations selected by the Arizona Department of Housing and the Sustainable Communities Working Group, providing base information on the square half mile area surrounding these sites.

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2010-06-10
Description

The purpose of this study is to provide flood and erosion hazard information for Soldier Canyon Wash for use by the District in floodplain use permitting and and floodplain management.

Created2008-06-27
Description

At a “micro” level, the study developed information and provided recommendations to assist each of the paratransit programs in the region to operate services in the most efficient and effective manner possible. At the “macro” level, the study considered alternative regional service designs and developed a regional service plan for

At a “micro” level, the study developed information and provided recommendations to assist each of the paratransit programs in the region to operate services in the most efficient and effective manner possible. At the “macro” level, the study considered alternative regional service designs and developed a regional service plan for the area that would improve mobility for people with disabilities and satisfy the requirements of the Americans with Disabilities Act.