Matching Items (156)
Filtering by

Clear all filters

115498-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body)
Created2011-03
Description

The Arizona State Rail Plan (SRP) is the first comprehensive assessment of the stateís rail needs and was initiated in response to the increasing involvement by ADOT in freight and passenger rail issues. The SRP serves to identify the current rail system, to determine infrastructure needs, and to have rail

The Arizona State Rail Plan (SRP) is the first comprehensive assessment of the stateís rail needs and was initiated in response to the increasing involvement by ADOT in freight and passenger rail issues. The SRP serves to identify the current rail system, to determine infrastructure needs, and to have rail projects included in the state's long-range planning processes to improve regional and statewide safety mobility. The principle purpose is to convey the magnitude of the rail needs in the state and set forth a policy framework through which strategic actions can be taken to realize the full potential of passenger and freight rail transportation.

42496-Thumbnail Image.png
Created2008-07-08
Description

Wilson & Company recently completed the City of Casa Grande Small Area Transportation Study. The SATS notes that “as the City of Casa Grande increases in size and planning area, the roadway network is also growing to meet the additional travel demands significant improvement measures are needed to meet the

Wilson & Company recently completed the City of Casa Grande Small Area Transportation Study. The SATS notes that “as the City of Casa Grande increases in size and planning area, the roadway network is also growing to meet the additional travel demands significant improvement measures are needed to meet the travel demand generated by forecast population and employment growth”. Given the findings of the SATS, the City of Casa Grande contracted with TischlerBise to calculate an infrastructure improvement plans and updated development fees for transportation.

42948-Thumbnail Image.png
Created2012-01-20
Description

The purpose of this study is to prepare a pedestrian circulation plan for the City of Nogales in the vicinity of and serving the three Nogales Ports of Entry. These ports are the DeConcini and Morley Gate Ports of Entry in downtown Nogales and the Mariposa Port of Entry to

The purpose of this study is to prepare a pedestrian circulation plan for the City of Nogales in the vicinity of and serving the three Nogales Ports of Entry. These ports are the DeConcini and Morley Gate Ports of Entry in downtown Nogales and the Mariposa Port of Entry to the west at SR 189.

42929-Thumbnail Image.png
Created2008-10-16
Description

The Town of Superior Small Area Transportation Study was initiated by the Town of Superior in conjunction with the Arizona Department of Transportation. The purpose of this study is to document existing roadway characteristics and operations, land use and socioeconomic conditions, and other existing transportation modes, and to craft a

The Town of Superior Small Area Transportation Study was initiated by the Town of Superior in conjunction with the Arizona Department of Transportation. The purpose of this study is to document existing roadway characteristics and operations, land use and socioeconomic conditions, and other existing transportation modes, and to craft a long-range transportation plan to meet the transportation needs of the Town of Superior. A travel demand model was prepared to forecast traffic volumes to assist in identifying the traffic impacts with the anticipated growth in and around the City.

117469-Thumbnail Image.png
Created2016-02
Description

The Ak-Chin Indian Community is nestled in the Santa Cruz Valley of Southern Arizona and encompasses 22,160 acres. Situated in northwestern Pinal County, the central portion of the Community is located five miles south of the City of Maricopa. State Route 347 runs north-south through the center of the Community,

The Ak-Chin Indian Community is nestled in the Santa Cruz Valley of Southern Arizona and encompasses 22,160 acres. Situated in northwestern Pinal County, the central portion of the Community is located five miles south of the City of Maricopa. State Route 347 runs north-south through the center of the Community, serving the Community, the City and the County. This roadway provides a direct route to Interstate 10 and the Phoenix metropolitan area, which is just 40 miles to the north. SR 347 also connects to Interstate 8 approximately 15 miles to the south. A second State facility, State Route 238 intersects the north end of the Community and provides east-west access to the City of Maricopa and SR 347 from the western edge of the Community. These regional facilities provide the Community with access to many needed services that are not available within the Community itself, including medical providers, shopping, and schools. Beyond the accessibility and mobility afforded by the State facilities, the Community is relatively landlocked served directly by only three rural roadways: Peters and Nall Road, Farrell Road and Ralston Road.

This planning project is to update the Ak-Chin Indian Communityís Long Range Transportation Plan. The study area is within the Community boundaries and adjacent Community-owned land. The principal focus of the project is to address the most critical transportation planning needs identified by the Community. This will include, but is not limited to a needs analysis and evaluation for all priority roadway corridors within the project area. The major transportation goals of the Community include: (1) Promote an effective, well-planned transportation system of roadways that establishes functional, safe, and durable streets; (2) Create ordinances, policies, or design guidelines that support the transportation plan; and (3) Provide for and encourage use of non-vehicle modes of transportation. The major product of the study will be a final report, which contains the updated Ak-Chin Indian Community Long Range Transportation Plan and a Plan for Improvements. Taking into consideration received input, the updated LRTP will span over five, ten and twenty year periods, incorporating both roadways and the multimodal needs of the Community.

Development of the Ak-Chin Indian Community Long Range Transportation Plan will be conducted according to a cooperative planning process involving stakeholders that include Community departmental staff, public agency staff, elected Community officials, and Community members. Throughout the study, information will be presented to and solicited from stakeholders through interviews and to the general public through public meetings and other means of communication.

117470-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body) / Coconino County (Ariz.) (Issuing body) / Burgess & Niple (Publisher)
Created2015-10
Description

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private land north of I-40 at Bellemont. Frequent congestion from heavy truck volumes and subdivision traffic causes traffic delays and creates concern for safety and timely emergency response. The 2008 closure of the ADOT Parks Rest Area on I-40, just west of Bellemont, has also increased vehicular traffic accessing the truck stop and restaurants. Future build-out of the subdivision and potential commercial/industrial uses in the area are expected to continue to negatively affect the Brannigan Park Road and Shadow Mountain Drive intersection and the I-40 traffic interchange. ADOT recently prepared the I-40 Bellemont to Winona Initial Design Concept Report, which recommended long-term improvements for the intersection and traffic interchange.

Ultimately, this access management and multimodal transportation study will provide a comprehensive review of the Bellemont area transportation system and provide guidance for determining priority needs for future improvements north of I-40, including alleviating congestion and improving/managing access, and improving and evaluating multimodal access to businesses from residential areas.

117477-Thumbnail Image.png
Created2015-07
Description

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services.

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services. Today, the community area serves as a major center for housing, education, health and government operations. Also in the Burnside area, the Ganado School District recently established a new high school and sports venue to accommodate track and field, baseball, and basketball activities.

There are four main roadway corridors that intersect the study area: State Route 264, US Route 191, Navajo Route 27 and Navajo Route 15. There are also county gravel roads and private and community dirt roads that intersect SR 264, the main traffic corridor. Within these routes there is substantial multimodal activity generated from the area schools, medical facilities, transit operations, government entities, utility providers and social programs. The principal focus of this study project is to address the most critical transportation planning needs identified by the Ganado Chapter and Apache County. This will include, but is not limited to, a comprehensive needs analysis of multimodal movements and traffic circulation as well as safety issues for the project area corridors. The major product of the study will be a final report, which contains a Plan for Improvements. Taking into consideration received public input, the Plan will span over five-, 10- and 20-year periods, incorporating both roadways and the multimodal needs of the area.

The Ganado-Burnside Area Traffic Circulation Study will also be conducted according to a cooperative planning process that involves stakeholders that include public agency staff, elected tribal officials and tribal community members. Throughout the study, information will be presented to and solicited from stakeholders through individual interviews and to the general public through public meetings and other means of communication.

117491-Thumbnail Image.png
Created2013-07
Description

The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.