Filtering by
- All Subjects: Transportation
- All Subjects: Cave Creek (Ariz.)
- All Subjects: Cochise County (Ariz.)
- All Subjects: Federal aid to transportation
- Creators: Battelle Memorial Institute. Technology Partnership Practice
The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while steering community development and project funding. The study findings will also be incorporated into the Town's Capital Improvement Planning process for the next 5-, 10-, and 20-year time frames.
This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.
During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.
To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.
This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.
This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.
Wilson & Company recently completed the City of Casa Grande Small Area Transportation Study. The SATS notes that “as the City of Casa Grande increases in size and planning area, the roadway network is also growing to meet the additional travel demands significant improvement measures are needed to meet the travel demand generated by forecast population and employment growth”. Given the findings of the SATS, the City of Casa Grande contracted with TischlerBise to calculate an infrastructure improvement plans and updated development fees for transportation.
The purpose of this study is to prepare a pedestrian circulation plan for the City of Nogales in the vicinity of and serving the three Nogales Ports of Entry. These ports are the DeConcini and Morley Gate Ports of Entry in downtown Nogales and the Mariposa Port of Entry to the west at SR 189.
The Yuma Regional Transit Study identifies transit needs within southwestern Yuma County and presents recommended transit system improvements based on three funding scenarios. This study examined current and projected population, demographics, and employment for the region, conducted extensive public outreach and data collection, identified transit deficiencies and developed recommended transit improvements based on the identified deficiencies.
This plan responds to key trends, emerging issues, and community visions and goals. The Plan includes strategies and actions for the years 2020 and 2040 to address identified transportation needs, while being sensitive to possible future funding constraints. This Final Report provides an overview of both the study effort and the work products developed throughout the planning process, which forms the basis for the final plan recommendations. The planning process analyzed the existing transportation system, land use and socioeconomic conditions within the study area; conducted in-depth local stakeholder interviews; developed future growth projections; provided opportunities for public input; and included an evaluation of alternative future solutions.