Filtering by
- All Subjects: Transportation--Planning
- All Subjects: Transportation
- Creators: Maricopa County (Ariz.). Department of Transportation
- Creators: Arizona. Transportation Planning Division
The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories. The SOS report has been produced annually since 1998.
The State Highway System includes 6,801 route miles of roadway and of this about 88% of the system's roadways are situated within rural areas with the remainder in urban areas. The System also includes 1,324 miles or 20% that traverse Native Nation/Tribal lands. In addition, there are 20 airports maintained and operated by the Native Nation/Tribal Governments.
Constitutes the Department's annual report and projected plans for the coming year. The report covers a five year period, but is issued annually.
This is Maricopa County's long-range plan for transportation. This plan was last produced in 1997. The Maricopa County Department of Transportation has undertaken the process of updating the Transportation System Plan because much has happened in Maricopa County since 1997. This updated TSP establishes an organized approach to the planning, design and construction of Maricopa County's transportation system through 2026.
The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.