Matching Items (3)
Filtering by

Clear all filters

113245-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body) / Arizona. Multimodal Planning Division (Issuing body) / Parsons Brinckerhoff (Publisher) / Maguire Company (Publisher)
Created2014-03
Description

The Multimodal Planning Division (MPD) of the Arizona Department of Transportation has been tasked with identifying corridors throughout the state where improvements to the transportation infrastructure supports the greatest potential commercial and economic benefits. These "Key Commerce Corridors" represent a strategic statewide approach to leverage infrastructure improvements to enhance Arizona's

The Multimodal Planning Division (MPD) of the Arizona Department of Transportation has been tasked with identifying corridors throughout the state where improvements to the transportation infrastructure supports the greatest potential commercial and economic benefits. These "Key Commerce Corridors" represent a strategic statewide approach to leverage infrastructure improvements to enhance Arizona's competitive economic position. This document presents the basis for the identification and evaluation of the Key Commerce Corridors.

42438-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2009-09
Description

Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change

Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.

42371-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2012-04
Description

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.