Matching Items (2)
Filtering by

Clear all filters

ContributorsWitcher, James (Author) / The Pride Publishing Company (Client)
Created1994
Description

This summary report overviews a State of Arizona and U. S. Department of Energy funded drilling project to determine if near-term hot dry rock (HDR) geothermal potential exists in the eastern portion of the White Mountains region of Arizona. A 4,505 feet deep slim-hole exploratory well, Alpine1/Federal, was drilled within

This summary report overviews a State of Arizona and U. S. Department of Energy funded drilling project to determine if near-term hot dry rock (HDR) geothermal potential exists in the eastern portion of the White Mountains region of Arizona. A 4,505 feet deep slim-hole exploratory well, Alpine1/Federal, was drilled within the Apache-Sitgreaves National Forest at Alpine Divide near the Alpine Divide camp ground about 5 miles north of Alpine, Arizona in Apache County (Figure 1). A comprehensive technical report, in two parts, details the results of the project. Part 1, Alpine1/Federal, Drilling Report, discusses the drilling operations,
logging program, permitting and site selection for the hole. Part 2, Temperature Gradients, Geothermal Potential, and Geology, summarizes the temperature gradients, heat flow, geothermal potential, and subsurface geology.

42961-Thumbnail Image.png
ContributorsThe Pride Publishing Company (Contributor)
Created2009-12
Description

The 2009 Navajo Nation Long Range Transportation Plan is a twenty-year comprehensive plan developed and updated by the Navajo Division of Transportation in a five-year cycle. The plan identifies the Nation’s multi-modal transportation needs over the next 20 years and develops strategies to meet them. The plan provides long range

The 2009 Navajo Nation Long Range Transportation Plan is a twenty-year comprehensive plan developed and updated by the Navajo Division of Transportation in a five-year cycle. The plan identifies the Nation’s multi-modal transportation needs over the next 20 years and develops strategies to meet them. The plan provides long range planning policies and implementation strategies for the Navajo Indian Reservation Roads Program improvements. It is based on a comprehensive analysis of all pertinent factors and issues affecting the Navajo Nation’s existing and future transportation needs.