Matching Items (5)
Filtering by

Clear all filters

Created2011 to 2016
Description

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories.

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories. The SOS report has been produced annually since 1998.

42771-Thumbnail Image.png
Created2002-01-07
Description

Describes the evolution of transportation routes and transportation methods in Pima County throughout time, and the effect that modes of transportation have had on the size and form of the community. Stage, freight, and railroad transportation followed the main historic corridors established by previous cultures and technologies.

68491-Thumbnail Image.png
ContributorsGammage, Grady Jr. (Author) / Welch, Nancy (Author) / Melnick, Rob (Author) / Godchaux, J. D. (Author) / Heffernon, Rick (Author) / Berman, David R. (Author) / Hart, William (Author) / Toon, Richard J. (Author) / Jacobs, Ellen (Author) / Lewkowitz, Barbara (Author) / Bennett, Dana (Author) / Artibise, Yuri (Author) / Pinal County Board of Supervisors (Client) / Morrison Institute for Public Policy (Publisher)
Created2007-07
Description

For most of the past 50 years, Pinal County hasn't had to think much about its image, choices, or growth. But now, Pinal County is changing faster than anyone ever imagined. Will Pinal become a distinguishable destination or simply a McMega drive through? If Pinal rises to the occasion, the

For most of the past 50 years, Pinal County hasn't had to think much about its image, choices, or growth. But now, Pinal County is changing faster than anyone ever imagined. Will Pinal become a distinguishable destination or simply a McMega drive through? If Pinal rises to the occasion, the result can be a vibrant, sustainable, and competitive place that takes advantage of its location. If Pinal fails to choose wisely, its bedroom community future is already visible in the East Valley and subdivisions north of Tucson. Which will it be?

When Arizona's economy depended on the 4Cs – copper, cotton, citrus, and cattle – Pinal County was a leader in 2 of them. These historic sources of wealth and touchstones of heritage still play a role in the county's economy, but dramatic population growth and new economic drivers make this a different, distinctive time. This new era demands new vision, new ideas, and new ways of thinking, even as past strengths are kept in mind.

68481-Thumbnail Image.png
Created2001-06
Description

Four major statewide "tools" to help manage growth and preserve open space have been put to work in Arizona over the past five years. These include the Arizona Preserve Initiative and the closely-related Proposition 303, as well as the Growing Smarter Act and its "addendum," Growing Smarter Plus. All four

Four major statewide "tools" to help manage growth and preserve open space have been put to work in Arizona over the past five years. These include the Arizona Preserve Initiative and the closely-related Proposition 303, as well as the Growing Smarter Act and its "addendum," Growing Smarter Plus. All four tools are based in large part on a concept known as "smart growth," which is generally considered to be a set of growth management measures that attempt to strike a balance among issues of economics, environment, and quality of life. Taken together, these four growth management tools make significant changes in the way that (a) city and county governments plan and regulate their lands, (b) citizens play a role in land use issues, (c) state trust lands are managed, and (d) open space may be acquired and preserved. Many of these changes will have long-term effects for the state. This paper provides a brief overview of each of the four growth management/open space tools, a preliminary accounting of major activities each one has stimulated, and a perspective on what can be expected for the future as expressed by a selection of growth planners and other leaders of growth management in Arizona.

68477-Thumbnail Image.png
Created1997-12
Description

The Arizona Head Start--Public School Transition Project is 1 of 31 demonstration projects designed to test whether advances by Head Start children could be maintained by continuing Head Start-type services into kindergarten through the third grade, and to identify, develop, and implement transition practices to bridge the gap between Head

The Arizona Head Start--Public School Transition Project is 1 of 31 demonstration projects designed to test whether advances by Head Start children could be maintained by continuing Head Start-type services into kindergarten through the third grade, and to identify, develop, and implement transition practices to bridge the gap between Head Start and public schools. This study evaluated the Arizona project in its fourth year of implementation. Participating were two cohorts of students at three transition and three comparison schools in Phoenix. The program components evaluated were: (1) developmentally appropriate practices, curriculum, and materials; (2) physical health, mental health, and dental services; (3) family services; and (4) parent involvement. Findings indicated that all components had been implemented by the time of the 1995-96 evaluation. Both cohorts had similar public assistance participation, and all groups showed dramatic decreases in public assistance since program entry. The vast majority of parents from all groups reported positive interactions with schools; qualitative data confirmed continuing positive impact on teachers, schools, and the Head Start agency. Transition services, especially those of family advocates, were seen as crucial to smooth transitions. There were observable differences between transition and comparison classrooms; however, quantitative data showed few significant differences in gains made by children between transition and comparison classrooms. Confounding variables of high attrition, variations in student English proficiency, and the existence in comparison schools of transition-like services may have influenced the results. Promising practices and further challenges were identified and recommendations were made for improving the collaboration between the Head Start program and the public schools, and improving the evaluation process. (Three appendices include a summary of data collection instruments. Contains 20 references.)