Matching Items (22)
Filtering by

Clear all filters

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

The Operating and Capital Budget is prepared with the goal of delivering a fiscally prudent, balanced budget. A Five-Year Capital and Operating Program identifies anticipated capital projects, their anticipated capital and operating costs, and funding sources.

42454-Thumbnail Image.png
ContributorsValley Metro Rail (Contributor)
Created2010-04
Description

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity transit/light rail transit element.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

42282-Thumbnail Image.png
Created2012-11-29
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Concentration Points for the Unnamed Wash 12, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data.

42283-Thumbnail Image.png
Created2012-11-29
Description

This Technical Data notebook has been prepared to study a portion of the Pegler Wash located in Pima County, Arizona. The objective of the TDN is provide regulatory discharge rates and floodplain limits along the Pegler Wash using better topographic, hydrologic, and hydraulic data.

42285-Thumbnail Image.png
Created2012-03-20
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Via Entrada Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Via Entrada Wash using better

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Via Entrada Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Via Entrada Wash using better topographic, hydrologic, and hydraulic data.

42286-Thumbnail Image.png
Created2011-02-21
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Campbell Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Campbell Wash using better topographic, hydrologic,

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Campbell Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Campbell Wash using better topographic, hydrologic, and hydraulic data.

42288-Thumbnail Image.png
Created2011-11-28
Description

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Nanini Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Nanini Wash using better topographic, hydrologic,

This Technical Data notebook has been prepared for a Letter of Map Revision application for a portion of the Nanini Wash located in Pima County, Arizona. The objective of the TDN and LOMR submission is provide regulatory discharge rates and floodplain limits along the Nanini Wash using better topographic, hydrologic, and hydraulic data.

42290-Thumbnail Image.png
Created2011-08-05
Description

The purpose of this study is to provide flood and erosion hazard information for the Canyon del Salto Wash for use by the Pima County Regional Flood Control District (District) in floodplain use permitting and floodplain management.