Filtering by
- All Subjects: Arizona
- Creators: Lin, Hsin-I
- Creators: Arizona. Governor's Drought Task Force
- Creators: White, Michael D.
The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.
The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.
Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.
An update to the Flagstaff Regional Plan 2030 (FRP30), to bring its Road Network Illustration (Map 25) into compliance with Arizona Revised Statute requirements and to resolve inconsistencies between Map 25 and parts of the Flagstaff City Code. This update does not alter the intent of FRP30; it is only concerned with correcting errors, removing legal vulnerability, and improving the readability of FRP30.
The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the Picture Rocks study area and recommend a program of short-range (0-5 years), mid-range (6-10 years), and long-range (11-20 years) improvements.
This document seeks to provide guidance to water users within the State and will strive to develop the building blocks for a long term, statewide conservation strategy and in the short-term, a phased approach for implementation of the strategy. This effort will not attempt to develop a “one-size fits all” approach to water conservation. Over the long term, it will merely provide the basis for assisting communities all over the state to establish new programs, strengthen existing programs and provide guidelines for more efficient water use.
The list was compiled by the Department of Water Resources in cooperation with the Landscape Technical committee of the Arizona Municipal Water Users Association, comprised of experts from the Desert Botanical Garden, the Arizona Department of Transportation and various municipal, nursery and landscape specialists. Individuals wishing to add or delete plants from the list may submit information to the Director of the Arizona Department of Water Resources for consideration.
From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.
In September 2005, some concerned Walker residents contacted the Arizona Department of Health Services in regards to the quality of groundwater in the area. The residents petitioned ADHS to perform well water tests to determine the character of the water, and whether there is any potential health risk associated with consuming or using the water. In response to the concerned community members and in agreement with the Agency for Toxic Substances and Disease Registry, ADHS collected water samples from the site and completed a health consultation. This health consultation evaluates if the levels of lead and other metals in the private wells in Walker area pose any adverse health effects.
This report evaluates the potential exposure pathways associated with vermiculite concentrate processing activities at the Ari-Zonolite facility. The site is located in the near downtown area of Glendale, approximately ½ mile from the city hall, downtown shops, and other buildings. The former Ari-Zonolite facility received vermiculite from the Libby, Montana, mine. From 1951 to 1964, the site was leased the site to the Ari-Zonolite Company. Following the removal of the vermiculite concentrate processing equipment in 1964, several businesses have occupied the site. None of these businesses were involved in vermiculite processing activities. The last occupant of the former vermiculite processing building was an automotive restoration business, which vacated the site in 2002.