Matching Items (16)
Filtering by

Clear all filters

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

Created2014 to 2017
Description

The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.

Created2005 to 2016
Description

Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

ContributorsDechter, Sara (Author) / Sarty, Stephanie (Author) / Mikelson, Jennifer (Author) / Donaldson, Clay (Author) / Flagstaff (Ariz.) (Author)
Created2015-11-12
Description

An update to the Flagstaff Regional Plan 2030 (FRP30), to bring its Road Network Illustration (Map 25) into compliance with Arizona Revised Statute requirements and to resolve inconsistencies between Map 25 and parts of the Flagstaff City Code. This update does not alter the intent of FRP30; it is only

An update to the Flagstaff Regional Plan 2030 (FRP30), to bring its Road Network Illustration (Map 25) into compliance with Arizona Revised Statute requirements and to resolve inconsistencies between Map 25 and parts of the Flagstaff City Code. This update does not alter the intent of FRP30; it is only concerned with correcting errors, removing legal vulnerability, and improving the readability of FRP30.

ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-09-03
Description

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the Picture Rocks study area and recommend a program of short-range (0-5 years), mid-range (6-10 years), and long-range (11-20 years) improvements.

42137-Thumbnail Image.png
Created2004-10-08
Description

This document seeks to provide guidance to water users within the State and will strive to develop the building blocks for a long term, statewide conservation strategy and in the short-term, a phased approach for implementation of the strategy. This effort will not attempt to develop a “one-size fits all”

This document seeks to provide guidance to water users within the State and will strive to develop the building blocks for a long term, statewide conservation strategy and in the short-term, a phased approach for implementation of the strategy. This effort will not attempt to develop a “one-size fits all” approach to water conservation. Over the long term, it will merely provide the basis for assisting communities all over the state to establish new programs, strengthen existing programs and provide guidelines for more efficient water use.

42038-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2004-08
Description

The list was compiled by the Department of Water Resources in cooperation with the Landscape Technical committee of the Arizona Municipal Water Users Association, comprised of experts from the Desert Botanical Garden, the Arizona Department of Transportation and various municipal, nursery and landscape specialists. Individuals wishing to add or delete

The list was compiled by the Department of Water Resources in cooperation with the Landscape Technical committee of the Arizona Municipal Water Users Association, comprised of experts from the Desert Botanical Garden, the Arizona Department of Transportation and various municipal, nursery and landscape specialists. Individuals wishing to add or delete plants from the list may submit information to the Director of the Arizona Department of Water Resources for consideration.

42186-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-12-15
Description

ADOC retained CGL to conduct a comprehensive review of the existing protocols, the application of these protocols in the case of Joseph R. Wood III, and an assessment as to whether the existing protocols are consistent with national best practices.

42332-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-06
Description

Transportation excise tax money is statutorily restricted to street and highway purposes or transportation projects. Gila County demonstrated that it spent excise tax monies during calendar years 2009 through 2013 to address traffic safety and congestion issues and deteriorating road conditions. Also, in January 2014, the County completed the Gila

Transportation excise tax money is statutorily restricted to street and highway purposes or transportation projects. Gila County demonstrated that it spent excise tax monies during calendar years 2009 through 2013 to address traffic safety and congestion issues and deteriorating road conditions. Also, in January 2014, the County completed the Gila County Transportation Study, which identified the most critical future transportation infrastructure needs and recommended projects to address those needs. We also determined that the County spent its excise tax monies solely for street and highway purposes or transportation projects as required by Arizona Revised Statutes §28-6392(B), and implemented all but one of our prior audit recommendations.

68477-Thumbnail Image.png
Created1997-12
Description

The Arizona Head Start--Public School Transition Project is 1 of 31 demonstration projects designed to test whether advances by Head Start children could be maintained by continuing Head Start-type services into kindergarten through the third grade, and to identify, develop, and implement transition practices to bridge the gap between Head

The Arizona Head Start--Public School Transition Project is 1 of 31 demonstration projects designed to test whether advances by Head Start children could be maintained by continuing Head Start-type services into kindergarten through the third grade, and to identify, develop, and implement transition practices to bridge the gap between Head Start and public schools. This study evaluated the Arizona project in its fourth year of implementation. Participating were two cohorts of students at three transition and three comparison schools in Phoenix. The program components evaluated were: (1) developmentally appropriate practices, curriculum, and materials; (2) physical health, mental health, and dental services; (3) family services; and (4) parent involvement. Findings indicated that all components had been implemented by the time of the 1995-96 evaluation. Both cohorts had similar public assistance participation, and all groups showed dramatic decreases in public assistance since program entry. The vast majority of parents from all groups reported positive interactions with schools; qualitative data confirmed continuing positive impact on teachers, schools, and the Head Start agency. Transition services, especially those of family advocates, were seen as crucial to smooth transitions. There were observable differences between transition and comparison classrooms; however, quantitative data showed few significant differences in gains made by children between transition and comparison classrooms. Confounding variables of high attrition, variations in student English proficiency, and the existence in comparison schools of transition-like services may have influenced the results. Promising practices and further challenges were identified and recommendations were made for improving the collaboration between the Head Start program and the public schools, and improving the evaluation process. (Three appendices include a summary of data collection instruments. Contains 20 references.)