Matching Items (4)

Filtering by

Clear all filters

Flagstaff Regional Plan 2030: Map 25 - Major Plan Amendment

Description

An update to the Flagstaff Regional Plan 2030 (FRP30), to bring its Road Network Illustration (Map 25) into compliance with Arizona Revised Statute requirements and to resolve inconsistencies between Map 25 and parts of the Flagstaff City Code. This update

An update to the Flagstaff Regional Plan 2030 (FRP30), to bring its Road Network Illustration (Map 25) into compliance with Arizona Revised Statute requirements and to resolve inconsistencies between Map 25 and parts of the Flagstaff City Code. This update does not alter the intent of FRP30; it is only concerned with correcting errors, removing legal vulnerability, and improving the readability of FRP30.

Contributors

Agent

Created

Date Created
2015-11-12

State of the System Report: Programming & System Analysis

Description

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories. The SOS report has been produced annually since 1998.

Contributors

Created

Date Created
2011 to 2016

Maricopa County Transportation System Plan

Description

This is Maricopa County's long-range plan for transportation. This plan was last produced in 1997. The Maricopa County Department of Transportation has undertaken the process of updating the Transportation System Plan because much has happened in Maricopa County since 1997.

This is Maricopa County's long-range plan for transportation. This plan was last produced in 1997. The Maricopa County Department of Transportation has undertaken the process of updating the Transportation System Plan because much has happened in Maricopa County since 1997. This updated TSP establishes an organized approach to the planning, design and construction of Maricopa County's transportation system through 2026.

Contributors

Created

Date Created
2007-02-07