Skip to metadata.
Document
Download Options
Name Type Format Size
Sahuarita/ El Toro corridor study : final report Original File
14.07 MB
42846-Extracted Text.txt Extracted Text
Unknown size

Details

Title
  • Sahuarita/El Toro Corridor Study: Final Report
Description

The Sahuarita/El Toro Corridor Study is a joint effort by the Town of Sahuarita and the Arizona Department of Transportation. The purpose of the study is to assess the feasibility of a transportation corridor that will provide adequate capacity for

The Sahuarita/El Toro Corridor Study is a joint effort by the Town of Sahuarita and the Arizona Department of Transportation. The purpose of the study is to assess the feasibility of a transportation corridor that will provide adequate capacity for the potential future growth of the Town of Sahuarita and surrounding areas as well as increase local and regional connectivity in Pima County. The study is being funded by Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division. In the completed Town of Sahuarita Transportation Study, it was recommended that El Toro Rd be constructed as a six-lane parkway to alleviate the severely congested principal thoroughfares due to the future growth identified in that study.

Date Created
2013-03
Resource Type
  • Text
  • Identifier
    • Identifier Value
      TRT 5.2:S 14/3

    Machine-readable links

    Share this content